Uncategorized

Why the Order of Vibration and Drops Changes Results

The specimen carries its history into the next stage

Vibration may settle the contents, shift a divider or change the gaps around a pack before a drop. A drop may first crease the carton or alter an insert and change how the assembly moves in later vibration. The specimen that reaches the second stage can therefore have a different starting condition.

A2dad28f8bdd5be5b2b4a795e14b7e66

Packaging sample showroom of SamBound New Material Technology Company Ltd. (sambound.com).

Use matched samples when diagnosing order effects

Suppose a cosmetic pack touches a carton wall only after its divider shifts during vibration. A subsequent drop can then send the impact through a different contact path. To investigate, compare matched samples assigned to different sequences. Photograph their condition at permitted checkpoints without opening or resetting the specimen if that would alter the required test.

Run a qualification sequence in the order specified by the procedure. Label any reordered runs as diagnostic and record the first stage at which a visible change appeared.

sambound.com
SamBound New Material Technology Company Ltd.